Compared with the traditional ball mill,the ceramic ball mill occupies an absolute advantage in terms of function,structure and operation.
Compared with the traditional ball mill,the ceramic ball mill occupies an absolute advantage in terms of function,structure and operation. The equipment has the advantages of large productioncapacity, high technological content and no noise at work. A higher sales,called the industry model, it is in the metallurgical, building materials,chemical, industrial and other fields plays an extremely important role. Inthis article from the following aspects to introduce this device in detail:
Ceramic ball mill works principle:
The motor on the ceramic ball mill drivesthe cylinder body to rotate through the speed reduction device, and then thecrushed ore and grinding balls in the cylinder body are subjected to thefriction and centrifugal force when the cylinder body rotates to a certainheight and then fall off due to gravity diarrhea, the ore in the impact andgrinding gradually crushed. Was crushed ore discharge part of the dischargetube. Exhausted minerals in the spiral classifier after the grading of qualifiedproducts, grit through the feeder and then returned to the ball mill tocontinue grinding. Feeder continuous and uniform feeding, the ore through thejoint feeder continuous and uniform into the ceramic ball mill, the gratedmaterial continuously discharged from the ceramic ball mill. Ceramic ball millis able to work continuously for 24 hours a day grinding equipment.
Ceramic ball mill installation methods:
After the completion of our purchase, weneed to install the ceramic ball mill, the installation is also a certainskill, not just installed, first of all we should know what to install, andthen install what, and we have to do for everyone installation steps:
First, you should install the main bearing.In order to avoid aggravating the wear and tear of the shoulder and bearinglining of the hollow shaft journal, the height difference of the base plate ofthe two main bearings should not exceed 0.25 mm per meter length.
2. Second, the installation of the ballmill cylinder, combined with specific conditions, the preassembled can beinstalled directly to the simplified body can also be installed in severalparts, and should check and adjust the journal and ball mill centerline, itsconcentric error must be guaranteed to be less than 0.25 mm per meter length.
3. Finally, install the transmission parts(pinion, coupling, reducer, motor, etc.). In the installation process, shouldbe measured according to product technical standards and adjustments. Check theradial deviation of ring gear and pinion meshing performance; concentricity ofreducer and pinion; and concentricity of motor and reducer. The final wateringof the foundation bolts and the main bearing plate can only be carried out whenall installation is satisfactory.