logo

Home>News>Product Knowlege

Complete active lime production line system

Qualified limestone (20~50mm) is lifted bythe hoist and transported to the top silo of the preheater​.

Complete active lime production line system

Qualified limestone (20~50mm) is lifted bythe hoist and transported to the top silo of the preheater. The top of thepreheater is controlled by the upper and lower two level gauges, and then the limestone is evenly distributed through the discharge pipe to each chamber ofthe preheater.


The limestone is heated in the preheater by the kiln flue gas at 1150 °C to about 900 °C, about 30% decomposition, pushed into the rotary kiln by hydraulic push rod, and the limestone is calcined and decomposed into CaO and CO2 in the rotary kiln. The limestone generated afterthe decomposition enters the cooler, and the cold air that is blown in thecooler is cooled to 100 ° C and discharged.

The heat exchanged 600 ° C hot air entersthe kiln and gas mixed combustion. The exhaust gas is cooled by a multi-tubecooler and then enters the baghouse through an induced draft fan, and thenenters the chimney through the exhaust fan.


The lime of the cooler is sent to the limeproduct warehouse through the vibrating feeder, the chain bucket conveyor, the bucket elevator and the belt conveyor.


INQUIRY

Please fill in your requirements for more information and quotation.
You will get a reply within 24 hours. Thanks.

Contact Us