logo

Home>News>Product Knowlege

Jaw Crusher for Hard Rocks Installation and Commissioning

The feeding specifications of the crusher shall not exceed 0.85 times the size of the mine mouth.

Jaw Crusher for Hard Rocks Installation and Commissioning

First, the reasonable use of  jaw crusher

1. The feeding specifications of the crushershall not exceed 0.85 times the size of the mine mouth.

2. Jaw crusher must start without load.

3. Jaw crusher is suitable for crushing hard,medium-hard ore and coarse crushing.

Second, the installation of crusher

1. The machine must be installed in a placeaway from the rain. It cannot be placed in the open air.

2. The motor must be installed at the rear ofthe crusher. The direction of rotation must be made according to requirementsand must not be reversed.

3. The machine should be fixed on theconcrete floor; the ground to leave the ore trough, the inclination is not lessthan 50°. The basic form can be determined by the user according to feeders andeucalyptus devices.

4. Before adjusting the discharge mouth,should first loosen the tension spring, after being adjusted, and then properlyadjust the tension of the spring, the degree of tension of the spring to beable to eliminate the noise between the elbow pad and the elbow at work Whennot falling off is appropriate.

5. The crusher and other equipment with themanagement and coordination, need to be conducive to production, is conduciveto assembly line operations, to ensure the work surface without congestion.

6. In order to facilitate the transportationof raw materials, mechanized transport equipment is best used in the incomingand outgoing materials.

7. Tighten the screws and connecting partsbefore testing and check the lubrication.

8. First use the manpower to move the pulley,to confirm that the movement is not impeded, you can carry out an empty carexperiment, within two hours, no impact, noise, seal leakage and pulley swingand loose shaft and so on. The temperature rise of the bearing must not exceed35℃. If the above fault is found, it must be stopped immediately formaintenance.

9. It takes ten hours for the user to performthe test, and if the secondary hard ore is used without any fault and thetemperature rise of the bearing does not exceed 70℃, it can be put intoproduction.